2012-RSK02

Using Method of Moments in Schedule Risk Analysis Risk Track RSK02_Paper_MethodofMomentsinScheduleRiskAnalysis_Covert RSK02_Presentation_UsingMethodofMomentsinSchedRiskAnalysis_Covert Abstract: A program schedule is a critical tool

Continue reading

2012-PAR13

Applying Parametric Cost Models as a Predictive Parameter for CMMI Compliance Parametrics Track PAR13_Presentation_ApplyingParametricCostModelsasaPredictiveParameterforCMMICompliance_Bloom Abstract: The Electronic Engineering Center (EEC)

Continue reading

2012-PAR12

Introducing Reliability and Availability Requirements into TOC Models Parametrics Track PAR12_Presentation_IntroducingReliabilityandAvailabilityRequirementsintoTOCModels_Lee PAR12_Paper_IntroducingReliabillityandAvailabilityRequirementsintoTOCModels_Lee Abstract: Two important system requirements are reliability and

Continue reading

2012-PAR11

Understanding and Measuring the Impact of Design and Systems Engineering Decisions on Affordability Parametrics Track PAR11_Presentation_UnderstandingMeasuringImpactofDesignandSysEngineeringDecisionsonAffordability_Jasnoff Abstract: Methodologies for understanding

Continue reading